C_TFIN22_67 Free Dumps Study Materials
Question 4: In customization for costing based CO-PA we assign costs and revenues to the required value
field. Match the following sources of value fields. 1 Cost Estimate i. Fixed Cost of Goods
Manufactured 2 WBS Elements ii. Freight costs 3 General ledger Posting iii. Research & development
costs 4 Production order iv. Estimated bonuses 5 Additional costs v. Production Variances Please
choose the correct answer. Response:
A. 1-i., 2-iii.,3-ii.,4-v.,5-iv.
B. 1-iv., 2-ii.,3-iii.,4-v.,5-i.
C. 1-ii.,2-iii.,3-i.,4-v.,5-iv.
D. 1-v., 2-iii.,3-ii.,4-v.,5-i
Correct Answer: A