https://www.lead1pass.com/IBM/C9060-521-practice-exam-dumps.html (70 Q&As Dumps, 30%OFF Special Discount: 30free )
NEW QUESTION NO: 6
How is storage pool automatic migration started?
A. increasing the High migration threshold to 100
B. lowering the High migration threshold to 0
C. increasing the LOw migration threshold to 100
D. lowering the LOw migration threshold to 0
Answer: D
Explanation/Reference:
Explanation:
To empty the storage pool, set LOWMIG=0.
Incorrect Answers:
A: To prevent automatic migration from running, set the HIGHMIG attribute of the storage pool definition to
100.
B: Migration occurs regardless of the value of the HIGHMIG parameter.
C: You can specify a number from 0 to 99 for the Low migration optional parameter.
References: https://www.ibm.com/support/knowledgecenter/SSGSG7_7.1.7/srv.reference/ r_cmd_stgpool_migrate.html
NEW QUESTION NO: 7
On which two operating systems can IBM Spectrum Protect software be installed with the IBM Spectrum Protect Entry license? (Select two.)
A. Linux
B. Solaris
C. AIX
D. Windows
E. System Z
Answer: A,D
Explanation/Reference:
Explanation:
The IBM Spectrum Protect Entry product is offered for only Windows, Linux on POWER, and Linux x86 platforms only.
Note: The Enterprise version can be installed on Linux, AIX, and Windows.
References: http://www-01.ibm.com/support/docview.wss?uid=swg27048958
NEW QUESTION NO: 8
Which three rules are used to process include/exclude statements? (Select three.)
A. If not excluded, it is included.
B. The list is read from the top down.
C. The entire list is read before processing.
D. The list is read from the bottom up.
E. Processing stops when a match is met.
F. If not included, it is excluded.
Answer: A,B,C
Explanation/Reference:
Explanation:
A: If you do not create an include-exclude list, the backup-archive client considers all files for backup services and uses the default management class for backup and archive services.
References: https://www.ibm.com/support/knowledgecenter/SSEQVQ_8.1.0/client/t_cfg_crtinclexcl.html
NEW QUESTION NO: 9
When would front-end capacity licensing be recommended?
A. the daily backup amount is very low
B. deduplication and compression will be used
C. long term data retention will be used
D. the software license bundle will be used, which includes IBM Spectrum Scale
Answer: C
Explanation/Reference:
Explanation:
The longer data need to be retained the more cost effective Frontend capacity licensing will become. If large amounts of data will be kept for years Frontend capacity will be more cost effective. Typically Backend licensing is more cost effective up to retention periods of 2 months. After 2 months Frontend licensing might turn out to be more cost effective.
References: https://www.ibm.com/developerworks/community/forums/html/topic?id=1a8c156e-75ac-4b03- b7f5-8226fedda551
NEW QUESTION NO: 10
How do administrators find out they have been assigned an alert and view the details of that alert?
A. Administrators log in to the Operations Center and view the Alerts page.
B. Administrators are notified daily by email of any alerts that are assigned to their ID.
C. Administrators are sent a text message that provides details of the assigned alert.
D. Administrators must query the activity log to view alerts.
Answer: A
Explanation/Reference:
Explanation:
The Operations Center includes an Overview page where you can view high-level status information. From the Overview page, you can navigate to other pages that provide more details. Most of the Administrative activities like Adding Client node, monitoring backup, Alerts, Network Traffic, Storage Pools, Maintenance and few other features only can be Performed with Operation Center.
References: http://techiessite.com/access-operate-tivoli-storage-manager-567/
NEW QUESTION NO: 11
A customer has 200 backup clients with a mix of AIX, Linux, and Windows. The customer also has a VMware environment with 1000 VMs. The data that is stored in the storage pools is in petabytes. Which license model is recommended for the customer environment?
A. IBM Spectrum Protect PVU Model
B. IBM Spectrum Protect Suite Front End Entry (TB)
C. IBM Spectrum Protect Suite Back End Entry (TB)
D. IBM Spectrum Protect Suite Front End (TB)
Answer: D
Explanation/Reference:
Explanation:
IBM Spectrum Protect Suite - Front End provides flexible, pay-as-you-grow data protection.
IBM Spectrum Protect Suite - Front End includes the following features:
A bundle of eight IBM Spectrum Protect products

Pricing and licensing are based on a front-end terabyte metric

Installation of as many bundled components as needed to help protect your environment

Incorrect Answers:
A: A Processor Value Unit (PVU) is a unit of measure used to differentiate licensing of software on distributed processor technologies (defined by Processor Vendor, Brand, Type and Model Number). IBM continues to define a processor, for purposes of PVU-based licensing, to be each processor core on a chip (socket). Each software Program has a unique price per PVU.
B: IBM Spectrum Protect Suite Entry - Front End V7.1.3 applies to Data Protection environments with the following size restrictions:
A maximum of two IBM Spectrum Protect servers per enterprise.

A combined maximum of 100 terabytes of data under management.

If a customer reaches the maximum of 100 terabytes of data under management and foresees the need for more licenses, IBM requires an upgrade to IBM Spectrum Protect Suite - Front End (5725-X07).
C: IBM Spectrum Protect Suite Entry V7.1.3 is a bundled offering that is designed for businesses with smaller storage environments. It provides a comprehensive, unified recovery management solution that covers all aspects of data protection requirements. Pricing and licensing are based on a back-end terabyte metric.
IBM Spectrum Protect Suite Entry V7.1.3 applies to Data Protection environments with the following size restrictions:
A maximum of two IBM Spectrum Protect servers per enterprise.

A maximum of 100 terabytes per enterprise.

If a customer reaches the maximum of 100 terabytes under management and foresees the need for more licenses, IBM requires an upgrade to IBM Spectrum Protect Suite (5725-X05).
References: ftp://ftp.scc.kit.edu/pub/tsm/mirror/front_end_capacity_measurement_tools/ IBMSpectrumProtectSuite_FE_LicenseGuide_713_en.pdf, page 1
NEW QUESTION NO: 12
Which option prevents overriding options from the client when using the Client Option Set?
A. Force=YES
B. Force=NONE
C. CLOPT=server
D. CLOPT=client
Answer: A
Explanation/Reference:
Explanation:
To prevent the client from overriding the value in the client option set, specify FORCE=YES.
References: https://www.ibm.com/support/knowledgecenter/SSEQVQ_8.1.0/client/b_ba_guide_win2.pdf, page 51
NEW QUESTION NO: 13
What must occur before adding one or more spoke servers to the hub server?
A. grant administrative privileges to spoke servers
B. define hub server as the target server
C. install IBM Spectrum Protect Operations Center on spoke servers
D. define server-to-server communications between hub and spoke severs
Answer: D
Explanation/Reference:
Explanation:
When you install the IBM Spectrum Protect server, the default configuration requires secure communication by using the Secure Sockets Layer (SSL) or Transport Layer Security (TLS) protocol.
Unless this requirement was disabled for both the hub and the spoke servers, you must add the certificate of the spoke server to the truststore file of the hub server.
References: https://www.ibm.com/support/knowledgecenter/SSEQVQ_8.1.0/srv.solutions/ t_msdisk_add_spoke.html
NEW QUESTION NO: 14
A Windows server D: drive is being archived using IBM Spectrum Protect on a weekly basis and the data is being retained on tape storage pool for period of 180 days.
As per changes suggested by the compliance team, the data on D: drive is now required to be protected on a daily basis and retained for a period of 90 days. To address this requirement, the methodology needs to be moved from Archive to Progressive Incremental.
The existing default management class WEEKLYARCHIVE containing the archive copy group is deleted and a new default management class DAILYBACKUP containing backup copygroup is created.
In this situation what would the retention be for the data already being archived in IBM Spectrum Protect?
A. Data will be preserved for an infinite period.
B. The archive retention grace period defined in the Policy Domain will be used.
C. Data is rebound to DAILYBACKUP and its retention of 90 days is used.
D. Retention present in the deleted WEEKLYARCHIVE (180 days) is used.
Answer: B
Explanation/Reference:
Explanation:
The server uses the archive retention grace period to manage archive copies of files when either of the following conditions occur:
The management class to which a file is bound, no longer exists. The default management class does

not contain an archive copy group.
The archive copy group is deleted from the management class to which a file is bound. The default

management class does not contain an archive copy group.
References: http://www-01.ibm.com/support/docview.wss?uid=swg21681511
NEW QUESTION NO: 15
Which administrative authority level is required to back up the IBM Spectrum Protect server database?
A. Operator
B. Policy
C. Storage
D. Node
Answer: A
Explanation/Reference:
Explanation:
An administrator with system authority can complete any task with the server and assign authority levels to other administrators.
Administrators with policy, storage, or operator authority can complete subsets of tasks.
An operator can perform backups.
Incorrect Answers:
A: An administrator with system authority can complete any task with the server and assign authority levels to other administrators.
References: https://www.ibm.com/support/knowledgecenter/SSERB6_8.1.0/ve.inst/c_ve_tsmadmin.html