Question 7: You have a requirement to cost all the employee's earning elements to the employee's cost
center except for the corporate bonus. Identify the two ways through which you can cost the
corporate bonus to a separate cost center.
A. Allocate 50% to the corporate cost center under Assignment costing (Navigation: People > Enter
and Maintain > Assignment > Others > Costing).
B. Set the element link to Fixed Costed. Specify the entire costing code combination at the element
link level, (Navigation: Total Compensation > Basic > Link).
C. Allocate 100% to the corporate cost center under Assignment costing (Navigation: People > Enter
and Maintain > Assignment > Others > Costing).
D. Override the cost center of the employee at the element entry level.
E. Change the employee's organization cost center to the corporate cost center (Navigation: Work
Structures > Organization > Description ).
Correct Answer: B,D
Explanation
Costing needs to be done for an individual element entry and can therefore be done at the Element
Entry Level (E). Alternative, the fixed costed method can be used in the element link whereby which