C8060-218 Free Dumps Study Materials
Question 9: A developer is testing an IBM Sterling B2B Integrator (SBI) Business Process (BP) that was
created using the Graphical Process Modeler (GPM). The developer is attempting to extract the
Primary Document containedin Process Data to a file system folder using a File System Adapter (FSA).
In the File System Adapter Service Editor and/or Service Configuration the developer has assigned
values to the parameters for the Action (Extract), extraction folder and for the file name to name the
extracted file. However, the process is failing at the FSA with an error indicating that the Primary
Document is null or doesn exist.Document is null or doesn? exist. The developer has verified that the
Primary Document does exist. What is the most likely cause of the error?
A. File System adapter Service Editor tab Message to Service Output Msg set to Messages Only
B. File System adapter Service Editor tab Message from Service Input Msg set to Allow Message Write
C. File System adapter Service Editor tab Message from Service Input Msg set to Allow Process Data
Write
D. File System adapter Service Editor tab Message to Service Output Msg set to Obtain Message First,
then Process Data
E. File System adapter Service Editor tab Message toService Output Msg set to Obtain Process Data
First, then Messages
Correct Answer: A