C2090-550 Free Dumps Study Materials
Question 17: After completing the upgrade of the Primary server while performing a cold HSB-
incompatible
upgrade, what is the correct sequence of steps to upgrade to the Secondary server?
A. Upgrade both servers; start and verify that the upgraded Primary server is in a PRIMARY
ALONE state; start the Secondary server and verify that it is in a SECONDARY ACTIVE
state;
perform a 'hsb connect' command to resynchronize the servers and restore to normal
operation.
B. Upgrade both servers; start and verify that the upgrade Primary server is in a PRIMARY
ALONE state; start the Secondary server and verify that it is in a SECONDARY ACTIVE
state;
perform a 'hsb netcopy' command followed by 'hsb connect' to resynchronize the servers and
restore to normal operation.
C. Upgrade both servers; start and verify that the upgraded Primary server is in a PRIMARY
ACTIVE state; start the Secondary server and verify that it is in a SECONDARY ALONE
state;
perform a 'hsb connect' command to resynchronize the servers and restore to normal
operation.
D. Upgrade both servers; start and verify that the upgraded Primary server is in a PRIMARY
ALONE state; start the Secondary server and verify that it is in a SECONDARY ALONE
state;
perform a 'hsb netcopy' command followed by 'hsb connect' to resynchronize the servers and
restore to normal operation.
Correct Answer: D